Only 1351 days after we moved in to our house and I have completed the beading around the kitchen joinery to hide the small gap between the joinery and wooden flooring. It was only 13 sections ranging from an inch to about 4 feet in length that needed gluing to the joinery. Unfortunately some of the very thin wood had warped slightly and so a lot of time was spent on my knees pressing bits of wood down that seemed to have an aversion to other bits of wood……
Fun stuff. 🙂